Excavation for foundation for new liquor spill collecting tank from NE corner looking SW.
Applying insulation on existing weak B.L. tank.
Lime rock track pit from W. end looking E.
Pouring fndn for tanks along E. wall of "B" mill Pulping Gr. from S. end looking N.
Demolished retaining wall at "A" mill Pulping Gr. knot chute E. end looking NW.
S. end of "B" mill machine room from S. end looking N.
"B" mill machine room broke pit from roof of "A" mill machine room looking W.
Excavation for new B.L. tanks and "B" mill evaporator bldg. from roof of existing warehouse looking S.
Excavation at N. end of existing lime kiln bldg. looking SW.
Hydrant # at E. side of hog fuel conveyor tower looking NW.
Machine rool accident S. end of "A" mill machine room.
SE. corner of "B" mill Power Gr. from walkway at E> wall of "A" mill Power Gr. looking SE.
"B" mill Power Gr. from roof of chip silo looking N.
Trench for 12" EAS line along N. wall of "A" mill evaporators from E. end looking W.
Brown stock & bleached H.D. tanks fndn. slab reinforcing steel - 75 tons "B" mill pulping from SW. corner looking NE.
S. end of tanks from SE. corner of "B" mill Pulping Gr. looking NW.
Warehouse addition from roof of "A" mill machine rm. looking N.
"B" mill machine rm. from roof of "A" mill tank looking N.
N. end of EAS neutralization tank looking SE.
Rerouted fuel oil lines with gilsulate covering N. side of salt cake unloading looking E.
Rerouted fuel oil lines at E. side of existing fuel oil heater building looking NW.
8" WFP-36-131 branch off of 10" WFP-36-127 looking NW along trench from N85 + 86 and E32 + 12.5.
Start of 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab N. end looking SW.
"B" mill brown stock & bleached H.D. tanks fndn. slab SW. corner looking NE.
Rapid drain tank at S. end of "A" mill Power Group looking E.
Knot dump at S. end of "A" mill Pulping Group looking NW.
Forming up W.W. chest looking NE.
Overflow from filter N. end of temporary walkway to "A" mill mach. rm. looking N.
No. 2 T.G. fndn. excavation from roof of #50 caustic tower looking E.
Tracks #17 and #18 from roof of "A' mill machine room looking N.
"B" mill Pulping Group from roof of "A" mill Pulping Group lookins SW.
New lime kiln feed end fndn. looking NW.
Tie-in at N. end of 10" WFP-36-127 looking NE.
No. 2 T.G. fndn. from top of #50 caustic tower looking E.
"B" mill machine room from roof of "A" mill machine roof looking SW.
"B" mill Power Group from staircase on E. wall of "A" mill Power Group looking SE.
Wooden walkway at utility bridge tower looking NE.
New lime kiln feed end fndns. from track #14 looking NW.
24" EM-36-062 tie-in to M.H. #86 looking NW.
Trench for 15KV 250MCM cable to water treatement plant looking W.
Damaged 15KV 250MCM cable.
New lime kiln foundations S. end from track #14 looking NW.
Staircase on E. wall of "A" mill Power Group from track #14 looking SW.
"B" mill Power Group from roof of hot end lime kiln building looking N.
S. end of "B" mill Pulping Group from roof of chemical unloading shed looking SW.
Soap spill from SE. corner of salt cake unloading shed looking SW.
Soap spill from Col. line 53A looking NW.
"B" mill Power Group from roof of existing lime kiln building hot end.
Damage to 12" GF-36-202 at #2 T.G. excavation looking W.
Rerouted fuel oil lines at NE. corner of "A" mill Power Group looking S.