Showing 1944 results

Archival description
1475 results with digital objects Show results with digital objects
2000.1.1.1.4.069 · Item · May 1965
Part of Cassiar Asbestos Corporation Ltd. fonds

Flight index for 68 aerial photographs accompanying item. Map depicts Clinton Creek area, identifying airfield and mine. Cartographic legend: "CASSIAR ASBESTOS CORP LTD" "FLIGHT INDEX" "DATE OF PHOTOGRAPHY MAY 1965" "SCALE OF PHOTOGRAPHY 1" = 900 APPROX." "McELHANNEY ASSOCIATES VANCOVER B.C." "JOB No C189/6524".

2000.1.1.4.3.01 · Item · [ca. 1951]
Part of Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts close view of four men in formal attire holding beverages while having a discussion. Left to right: Jack Christian (President Cassiar), Fred Martin Connell (Chairman and Chairman of Conwest Exploration Company Limited), W. Harold Connell (older brother of FM and Director of Conwest), and Charles Rainforth Elliot (Director and President of Conwest Exploration). Framed painting visible on wall in background.

2000.1.1.4.3.02 · Item · [ca. 1951]
Part of Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts close view of four men in formal attire holding beverages while having a discussion. Left to right: Jack Christian (President Cassiar), Fred Martin Connell (Chairman and Chairman of Conwest Exploration Company Limited), W. Harold Connell (older brother of FM and Director of Conwest), and Charles Rainforth Elliot (Director and President of Conwest Exploration). Framed painting visible on wall in background.

Certain Teed
2000.1.1.1.31 · Item · 1970
Part of Cassiar Asbestos Corporation Ltd. fonds

This photograph is an aerial depiction of what is believed to be a Certain Teed factory in the United States. Certain Creed is a manufacturing company that supplies building materials. They have been in operation since 1904 to present. This photograph was found along with invoices, shipping orders and correspondence between Certain Teed and Cassiar.

2000.1.1.3.13.04 · Item · [before 1970]
Part of Cassiar Asbestos Corporation Ltd. fonds

Photograph depicts the Cassiar townsite behind shadow in foreground. Plantsite can be seen including the mill, dry rock storage building, tailings pile, and many other buildings. Mountains in background. Handwritten annotation on recto: "<- 13 1/2" ->". (This photograph was made into a promotional poster.)

2000.1.2.3.7 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the gymnasium lighting layout. Also show is an isometric view of the air supply unit piping as well as a ventilating unit automatic control diagram. Included are detailed notes regarding system desriptions, its plan and layout as well as directions for the automatic control of the ventilation unit and heating systems. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/12).

2000.1.2.2.7 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the gymnasium lighting layout. Also shown is an isometric view of the air supply unit piping as well as a ventilating unit automatic control diagram. Included are detailed notes regarding system desriptions, its plan and layout as well as directions for the automatic control of the ventilation unit and heating systems.

2000.1.2.3.6 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the overall layout of the heating and ventilating units to be used for the first and second floor of the recreational centre. Details include the locations of fans, boilers, ducts and exhausts as well as typical heating connector connections and the plumbing layout. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/11).

2000.1.2.3.1 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the general layout of the recreational centre. Top-down, side and front perspectives are used. The ground floor, second floor, outside walls and stage layouts are shown. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/06).

2000.1.2.3.5 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the overall framing structure of the recreational centre. Details include a cross section layout of the recreational centre with relevant framing dimensions, the locations and instructions for assembly as well as types of framing materials to be used. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/10).

2000.1.2.2.5 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the overall framing structure of the recreational centre. Details include a cross section layout of the recreational centre with relevant framing dimensions, the locations and instructions for assembly as well as types of framing materials to be used.

2000.1.2.3.3 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the detailed plans for the recreational centre's entrance hall. There are details pertaining to the elevation of entrance doors, the overall plan of the entrance hall, the upper level staiwell as well as handrailing details. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/08).

2000.1.2.3.2 · Item · June 1959
Part of Cassiar Asbestos Corporation Ltd. fonds

This blueprint depicts the outside layout of the recreation centre and includes its north, south, east and west elevations. Details are included regarding the materials to be used for construction. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/07).