Temporary support for chip conveyor bent # looking SE.
Southwest corner of chemical unloading shed looking SE.
"B" mill Pulp Gr. from roof of #1 WWS tank looking NW.
"B" mill Power Gr. from SE. corner looking NW.
"B" mill machinery room from roof of blending tank looking N.
"B" mill machinery room from roof of bleached H.D. tank looking N.
"B" mill MR from roof of bleached H.D. tank.
Condition of pipe under Polykin tape.
Condition of pipe under Polykin tape.
Condition of pipe under Polykin.
MR floor.
1.5" tie in GF#6.
Room roof of Bleached H.D. tank looking N.
Retaining wall at fuel oil day tank looking N.
Looking N. along track #18 pit in new warehouse from roof on "A" mill machine room.
"B" mill broke chest from roof of "A" mill machine room looking SW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking S.
Pipe culvert under soap track # at N. end of soap shed looking E.
Foundation excavation for 42' tank from S. side looking N.
Formwork for new capacitor room from top of grade wall at MXE-56 looking NW.
Looking NE. along column line MXA from E. side of NW chest fndn.
S. end of new warehouse looking E. from N. end of "B" mill machine room.
N. end of new warehouse looking NE. from N. end of "B" mill machine room.
Excavating for #2 turbo generator bldg. looking N.
New lime kiln fndn. excavation from N. end looking S.
No. 10 DV house from E. side looking SW.
No. 2 turbo-gen. bldg. excavation from roof of caustic tower #5 looking E.
Rerouted oil lines running along W. side of existing soap skimming tank looking S.
CL2 bleach tower #10 pedestal form wash from column PD2X34P "B" mill Pulp Gr. looking SW.
Fndn. excavation at N. end of existing lime kiln bldg. from track #14 looking W.
Lime kiln precipitator fndn. looking NW.
Brown and bleach stock H.D. tank fndn. slab from SW. corner looking NE.
No 2 T.G. fndn. excavation from S. end looking N.
Reroute fuel oil lines E. side of "B" mill Power Gr. from S. end of trench looking N.
S. end of "B" mill Pulp Gr. from roof of "A" mill digester looking S.
Construction camp from roof of "A" mill digester looking SE.
Contractors temporary power panels 60A 120-240 T15.
Northwood temporary power panel 60A-600V.
"B" mill machine room from SE. corner of locker room looking NE.
S. end of "B" mill machine rm. from roof of "A" mill machine rm. looking SW.
"B" mill machine rm. from roof of "A" mill bleached H.D. tank looking N.
Lime kiln precipitator fndn. from track #14 looking SW.
"B" mill Power Gr. from NE. corner looking SW.
S. end of bleach towers from SE. corner of "B" mill pulping group looking NW.
"B" mill machine room from roof of "A' mill machine room looking SW.
N. end of "B" mill machine room from roof of "A' mill machine room looking NW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking SE.
Lime kiln precipitator foundation excavation from track #14 looking W.
Lime rock rail car dump pipe from roof of chip blower bldg. looking N.
Staircase from E. side of Power Blr. bldg. at new location on S. of bldg. looking NE.