See drawing attached [man standing beside railroad tracks]
Drawing attached [railroad plans]
Trench for 24" WMC-36-141, 24" WMC-36-061 & 10" GF-36-204 at E. end looking West.
Power to pulp utility bridge East end - looking West
From just West of #2 seal tank - looking South btween #1 Blow Tank & Digester Tw.
Looking NE from just South of mens locker room.
Looking North between #1 Blow Tank & Digester Tower.
Tank overflow - Bleach plant.
Floor trench overflow - Bleach plant.
Existing acid effluent (EA) from seal tank #15 and Bleach plant looking SW.
Existing acid effluent (EA) from seal tank #15 and Bleach plant looking SW.
Temporary support for chip conveyor bent # looking SE.
Southwest corner of chemical unloading shed looking SE.
"B" mill Pulp Gr. from roof of #1 WWS tank looking NW.
"B" mill Power Gr. from SE. corner looking NW.
"B" mill machinery room from roof of blending tank looking N.
"B" mill machinery room from roof of bleached H.D. tank looking N.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3 hrs. (3:30 p.m.)
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
View from S. of gate on chip truck road looking S. along new camp access road.
North chip conveyor bent support.
West leg, North bent of chip conveyor looking S.E.
Chip dumper - looking N.
Looking along trench from camp ES #5 MH to Lift Station.
Spirogester tank, looking S.
Pulping Group excavation - looking N.
From roof of Digester - looking S.W.
30" EAS 36-003 under existing 30" EC
12" EA line from Recaust Pump House into existing 36" EA Wood Stave Line.
36" WMC-36-144 in trench looking SE.
Stockpiling pit run from SE corner of old gravel pit looking NE.
14" FRP EA line connection into MH#.
36" VMC-36-140 excavation at N63 + 45 looking NW.
Track supports over 30" EC-36-040 & 30 EM-36-060 looking NW.
36" WMC-36-140 looking SE from N63 + 75.
Looking NE from top of pit run stockpile.
Pit run & 3/4" minus stock piles looking NE. Pile driving rig for W. bridge at R.
WFP tie-in at N53 + 47 x E49 + 90 looking East.
Influent and effluent boxes for Spirogester.
Looking NW across M.R. excavation from E. end of walkway. First day of work.
Pulp. Gp. excavation from point near SW corner existing Pulp. Gp. looking SE.
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. NW.
Spoiled. [pipe laid in a ditch]
View from NW corner of walkway into 3" dia. W.P. excavation (machine room)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
Le Tourneau moving logs.
Propane vapourizer station - East side Power Group.
Putting in thrust block form 3" WP line West of M.R.
Broken electrical cables in Power Group excavation.
Looking S.W. into Power Group excavation.