"B" Mill Recaust #5 Weak Wash Tank Metal jacket completed by J. Drexel. Central N.W. road looking E.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.E.
"B" Mill recovery Bldg. lifting 1st economizer tube bundles (top) to correct elevator. Looking West.
"B" Mill Machine Room N-S road looking N.E.
"B" Mill Machine Room - 3rd Press Pit steel insert for agitator B/L MXB.
"B" Mill #2 Turbo-Generator Building looking N.
"B" Mill Machine Room - 3rd Press Pit Concrete Wall B/L 60-61, MXB, MXC.
Overflow through Caustic Effluent M/H near Bleach Tower #60 looking S.E.
"B" Mill Power Group Black Liquor Tanks, Evaporator and #2 Turbo Generator Building looking S.E.
Chip Handling Scalping Screen Discharge Chute looking N.W.
Waste materials at putrescible dump looking S.E.
"B" Mill Machine Room air line from "A" Mill Machine Room at Col. line 65 looking N.E.
"B" Mill Machine Room rebar cut in way of anchor bolts looking S.W.
Water Treatment Plant Clarifier looking N.E.
Recaust - New Lime Kiln section showing tire pads looking N.E.
"B" Mill Power Group Economizer tube bundles looking S.E.
"B" Mill Pulping Group, Base of Digester looking N.E.
"B" Mill Machine Room S. side of White Water Chest looking n.
"B" Mill Pulping Group. Digester erection and service hoist, N. wall looking south.
"B" Mill Power Group #2 Turbo Generator building S. side looking N.
"B" Mill Pulping Group. Bottom shell of Digester.
"B" Mill Pulping Group. Bottom shell of Digester.
"B" Mill Pulping Group, Digester Tower, N. wall looking S.
Loading gravel for stock pile from winter road looking N.E.
No. 2 Rail Car Chip Dumper Tunnel excavation looking N.E.
Heating Duct along W. wall "A" Mill Machine Room looking S.W.
"A" Mill Bleached Stock Spill N. of "A" Mill Hi-Density tank looking S.E.
"B" Mill Machine Room blowers for heating and ventilating system.
"B" Mill Pulping Group. Clove Rotor Thick Stock Pumps.
"B" Mill Pulping Group. ClO2 Plant Salt cake slurry tank.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.W.
Water Treatment Clarifier looking S.E.
"B" Mill Pulping Group Bridge Crane looking N.W.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.E.
Water Treatment Clarifier looking S.W.
"B" Mill Pulping Group, Digester Tower S. side looking N.
Excavation at #2 Rail Car Chip Dumper looking S.E.
"B" Mill Power Group from track #14 looking N.
"B" Mill Machine Room low bay lighting looking S.
"B" Mill Machine Room from N.W. Corner looking S.E.
Capacitor room from N.E. corner looking South West.
"B" Mill Pulping Group from Track #14 looking North West.
42" 0 FRP Lagoon inlet pipe from looking S.
Lagoon Site from N.E. corner looking S.W.
"B" Mill Pulping Group from Col. line 32P looking N.
"B" Mill Pulping Group from near Woods Division Building looking S.E.
B.L. Tanks from in front of Maintenance Shops looking S.E.
Capacitator and X fmr Rooms "B" mill Machine Room looking S.E.
Temporary cable bridge to #2 Chip Rail Car Dumper looking N.W.
Chip Screen building foundations from S.W. corner lookng N.E.