Lagoon weir box base slab looking N.W.
Lagoon S. end of culvert under lagoon outlet pipe looking N.W.
Unloading digester shell plates near chip silos looking S.E.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
Trussed girt on W. wall of "B" Mill pulping group column connection looking.
Trussed girt on W. wall of "B" Mill pulping group bracing connection looking West.
Wall on W. side of existing Black Liquor Tanks looking N.E.
No. 2 and #1 Chip Dumper foundations looking N.E.
Chip Screen Building excavation and foundations S. end looking W.
Chip Screen Building excavation and foundations N. looking W.
New Lime Kiln piers from Track #14 looking N.W.
Recaust W.W.S. pukps aisle area foundations from W. side of 42 swing tank foundation looking N.W.
36" WMC-36-149 and 24"EMUC-36-073 risers inside W. wall of "B" Mill Evaporator Building looking S.W.
Trench at E. side of H.A.S. Field Office looking S.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
Utility Bridge Bent from W. side looking S.E.
"B" Mill Machine Room W. wall looking N.E.
Under ground pipes at S.W. corner of Chip Surge Bin building looking N.E.
Intersection of 8"S-47-002 and 42"EAS-36-001 looking S.E.
42"EAS-36-001 just W. of Water Treatment Plant looking S.W.
Excavation far Utility Bridge Tower T4 looking S.E.
Deaerator and feedwatr tanks from S. roof of "A" mill Power Group looking E.
"B" mill Power Group from roof of Recaust building looking N.E.
"B" mill Machine Room from Column MXA X 71 looking S.W.
"B" mill Pulping Group from N-S roadway looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
30" EMUC-36-060 from Col. line 34P "B" mill Pulping Group looking S.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
"B" Mill Power Group from N-S Roadway looking N.E.
"B" Mill Pulping Group from near Woods Div. building looking S.E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
"B" Mill Machine Room roof from roof of "A" mill Machine Room looking N.W.
Lagoon site from S.W. corner of existing lagoon looking S.E.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of stock pile looking W.
Lagoon site from top of stock pile looking N.W.
Water Treatment Clarifier from N. side of Water Treatment Plant looking N.
Lagoon site from S.W. corner of existing lagoon looking E.
Lagoon site from top of sand stock pile looking N.W.
Trench along N. side of Water Treatment Plant looking E.
"B" Mill machine Room from near Sub-station looking S.E.
Looking E. down South dike from aoubt TP19.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking W.
Lagoon site from top of sand stock pile looking W.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Steel topped out "B" mill Pulping Group looking N.E.