"B" Mill Machine Room from near Locker Room looking North East.
Lime Kiln Section looking South East.
Roof of weather protection enclosure for welding up digester sec.
Dennis Matson, Member of Expansion Team and Technical Superintendent, stands beside a row of washer drums.
An aerial of Northwood Pulp Mill during the expansion with the construction occurring in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the mill in the background and the parking lot in the foreground.
The newly constructed chip silos.
The new digester building.
The construction of the new digester tower.
A helicopter attaches a pipe to the side of the digester.
An aerial view of the Northwood Corporate office, with a forested area and a road in the background, the office in the midground and the parking lot in the background. Photographer of this oversized photograph is believed to be Bill Theessen.
Overview of washer line.
Unidentified man testing liquids in a lab.
Pulp sample being tested by a model 549 Micrometer.
Overview.
Unidentified section of the "A" digester chip feed system.
Unidentified section of the "A" digester chip feed system.
Unidentified section of the "A" digester chip feed system.
Unidentified section of the "A" digester chip feed system.
Unidentified section of the "A" digester chip feed system.
Chip screens.
Chip screen.
Exterior perspective featuring newly installed joy precipitator in steam and recovery plant.
Exterior perspective of the pulp mill on a hazy day.
Exterior perspective featuring smoke stacks.
Exterior perspective.
Exterior perspective featuring Northwood emblem on digester.
Exterior perspective - Close-up of exterior brick tank wall.
Exterior perspective - brick tanks.
Exterior perspective - Workers on an exterior building platform.
Unidentified section of the steam recovery boiler, cascades and evaporator.
Brown decker in "A" mill.
Forest covered mountain in winter.
Chip silos.
Title slide for fire training visual aid material.
Photograph featuring an unidentified mining camp (?)
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3 hrs. (3:30 p.m.)
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
View from S. of gate on chip truck road looking S. along new camp access road.
North chip conveyor bent support.