Affichage de 2696 résultats

Archival description
Cassiar, BC Anglais
Aperçu avant impression Hierarchy Affichage :

985 résultats avec objets numériques Afficher les résultats avec des objets numériques

Cassiar Recreational Centre General Arrangement Annotated

This blueprint depicts the general layout of the recreational centre. Top-down, side and front perspectives are used. The ground floor, second floor, outside walls and stage layouts are shown. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/06).

Cassiar Recreational Centre Elevations Annotated

This blueprint depicts the outside layout of the recreation centre and includes its north, south, east and west elevations. Details are included regarding the materials to be used for construction. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/07).

Cassiar Recreational Centre General Cross Section View Annotated

This blueprint depicts a cross-section layout of the recreational centre which includes a 1/4 scale drawing of a wall unit. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/09).

Cassiar Recreational Centre Framing Details Annotated

This blueprint depicts the overall framing structure of the recreational centre. Details include a cross section layout of the recreational centre with relevant framing dimensions, the locations and instructions for assembly as well as types of framing materials to be used. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/10).

Cassiar Recreational Centre Light Fixture Layout and Mechanical Details Annotated

This blueprint depicts the gymnasium lighting layout. Also show is an isometric view of the air supply unit piping as well as a ventilating unit automatic control diagram. Included are detailed notes regarding system desriptions, its plan and layout as well as directions for the automatic control of the ventilation unit and heating systems. Annotations in gold pen and pencil regarding clarification and changes to certain details are included. Numerical annotation at the bottom right hand of plan imposed new numbering system (3002/09/12).

Cassiar Asbestos Corporation Proposed Tramway Riblet

This blueprint shows the side profile of the proposed tramway to be built in Cassiar. It includes scale drawings of the crusher building, power house and support structures. The degree of tilt of the support structures are marked down where applicable. The side profile is divided into five sections due to the scaled height in elevation and the lack of drawing space. Annotation written along the leading edge of the blueprint reads "Proposed Tramway Riblet".

Layout of Transfer Station and Operational Discharge of Jig Back and Loading of Monocable

This blueprint shows the top-down (showing the plan view) and the side view (showing elevation) of the transfer station layout. The process and operation of the jig back discharge and monocable loading are also included. Relevant measurements and dimensions are included as well as locations of the loading chute, the loading area, monocable as well as empty and loaded rope lines.

Cassiar Asbestos Corporation 1972 Bench Plans

A set of 13 maps showing approximate waste extraction areas for different benches during certain months of 1972. Extraction dates are included accompanied by estimated total tonnages for each planned extraction area. All plans are hand drawn using colored pencils, lead and black ink. Approximate calculations of extraction tonnages are included within certain months. Numerical bench markers are included. Total tonnages from the previous year and previous surveys are included within certain plans.

6290 Bench Plan for November 1972

This map depicts the generalized pit layout and estimated waste extraction areas for 6290 bench for the month of November. Annotated details include numerical bench markers and waste extraction dates. The hand drawn plan consists of solid and dotted lines drawn with green, orange, red, blue and lead pencil.

6350 Bench Plan for 1972

This map depicts the pit layout and estimated waste extraction areas for 6350 bench. Extraction dates accompanied by its total tonnages are located within each planned area. Annotated details include extraction dates, approximate total tonnages per area as well as extraction dates, total planned and broken tonnages and total tonnages from December 31, 1970 from a survey done in September 30. The hand drawn plan consists of solid lines drawn with red, green and orange colored pencils.

Ore Type and Geology Map

This map depicts the ore type and geology that can be found among each of the bench layers. Classifications and grades of ore are included within it. Different bench layers are included in the map. Annotations include a title in the back of the map written out as "1972 BENCH PLANS".

1979 Operating Budget Proposal

This collection is proposed Cassiar development for the operating budget in 1979. The photographs are of poster-size presentation information. Topics covered include: operating graph of cost vs. fibre production, productivity rates, waste removal, ore mining cost vs. ton, primary crushing cost vs. ton, ore delivery cost vs. ton transported, stockpile drying and storage cost vs. ton feed, milling cost vs. ton fibre, establishment of funds allocated to townsite, staff, O&T and P&M, three proposed plans for 1979 and the requirements and costs for these proposals.

Early Cassiar Site

A collection of photographs from the site that Cassiar was being built in the early 50s. Photos depict lumber piles, early camp area, the first buildings, mountains, and the creek.
Along with this collection there are a set of images also from the early Cassiar site mainly depicting a dirt road and various individuals and machinery along it.

Manager's Photos - Cassiar Hills

Photograph depicts plant site, two mountains in background. Power poles, box, and piles of unidentified material in foreground. Speculated corresponding annotation on verso of page stapled to photograph: "Cassiar Hills (Midday in December)".

Manager's Photos - Ore Chute

Photograph depicts an ore gravity chute on McDame Mountain. Corresponding note on accompanying photo description page: "August 5th: 12. Ore chute down mountain slope." Typed annotation taped to verso of page stapled to photograph: "View looking down portion of chute."

Manager's Photos - Cassiar Hills

Photograph depicts mountains, half covered in shadow. Power poles and power house in foreground, piles of unidentified material on right. Speculated corresponding annotation on verso of page stapled to photograph: "Cassiar Hills (Midday in December)".

Manager's Photos - Men in Snow

Photograph depicts eight men in snow around unidentified object, speculated to be portion of glacier. Speculated corresponding annotation on verso of page stapled to photograph: "Overturned Tanker (Glacier 1 mile north of Joe Reed's)".

Manager's Photos - Men and Buckets

Photograph depicts three men bent over metal buckets in dirt on mountainside. Rocks, rakes, and bags in foreground, man in distance, snow-covered mountain in background. Unidentified object or structure in background.

Manager's Photos - Sub-Station Building

Photograph depicts small wood building built on tall wood poles adjacent to power house. Ladders, building materials, covered object, and unidentified structure [box of truck/shop foundation ?] in foreground. Corresponding note on accompanying photo description page: "August 20th: 8. Sub-station building and poles. Power House on the left. Oil tanks on the right."

Manager's Photos - Plant Site, East View

Photograph depicts unidentified vehicle on road to plant site. Power house, sub-station, oil tanks, and ore stockpile in view. Trees in foreground, buildings materials to right of road, mountains in background. Corresponding note on accompanying photo description page: "August 25th: 11. Plantsite. Taken from warehouse roof and looking east."

Manager's Photos - Washout in Ditch

Photograph depicts severely damaged road and ditch, trees and mountains in background. Corresponding note on accompanying photo description page: "1. Wash-out of ditch in valley road due to heavy rains. This section is just north of old camp site. Tractor in background."

Manager's Photos - Snow in Gully

Photograph depicts truck on mountain road, man on right, snow on left. Snow exceeds height of truck. Corresponding note on accompanying photo description page: "Pictures taken July 5th, 1952: 1. Showing depth of snow in first gully north of talus."

Manager's Photos - Snow on Talus

Photograph depicts snowy mountaintop, wooden shelter and truck in foreground. Corresponding note on accompanying photo description page: "Pictures taken July 2nd, 1952. 1. Picture taken from campsite showing snow on talus."

Résultats 1 à 50 sur 2696