Retaining wall at fuel oil day tank looking N.
Dry pipe valve house #10 (DPV #10) near hog conveyor tower looking NW.
Dry pipe valve house #10 (DPV #10) near hog conveyor tower looking NW.
Dry pipe valve house #10 (DPV #10).
Dry pipe valve house #10 (DPV #10).
Machine room looking N. from roof of #2 blow tank.
Pouring blow tank foundation from side of Pulping Group looking NE.
Dry pipe valve house (DPV #10).
NE. corner of Pulping Gr. looking SE. from roof of #2 blow tank.
NW. corner of Pulping Gr. looking S. from roof of #2 blow tank.
Lime kiln foundation excavation from N. end looking S.
Blending tank & broke tank foundation excavation from SW. corner looking NE.
Dry pipe valve house #10 (DPV #10).
Warehouse from N. end looking south.
Ground densification piles at N. end of Power Group from W. side looking E.
Power Group from S. end looking N.
Precipitation bldg. excavation from NW corner looking SE.
Kiln foundation excavation S. end looking N.
Lime rock track pit from roof of chip surge bin bldg looking N.
Looking N. along track #18 pit in new warehouse from roof on "A" mill machine room.
"B" mill broke chest from roof of "A" mill machine room looking SW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking S.
Pipe culvert under soap track # at N. end of soap shed looking E.
Foundation excavation for 42' tank from S. side looking N.
New warehousing from roof of "A" mill machine room looking NW.
"B" mill machine room from roof of "A' mill machine room looking SW.
N. end of "B" mill machine room from roof of "A' mill machine room looking NW.
NW. corner of "B" mill Pulping Gr. from roof of #2 blow tank looking SE.
Lime kiln precipitator foundation excavation from track #14 looking W.
Lime rock rail car dump pipe from roof of chip blower bldg. looking N.
Foundation excavation black liquor tank in foreground, "B" mill evaporator bldg. in background from warehouse roof looking S.
Foundation excavation for recaust bldg. extension from roof of caustic tower #50 looking SE.
"A" mill machine room from roof of #2 blow tank looking N.
Foundation excavation for recaust bldg. extension.
Trench for rerouted bunker coil liner etc. from S. end looking N.
"B" mill recovery boiler foundations from stairs on E. wall of "A" mill, power boiler bldg. looking NE.
New lime kiln fndn. excavation from N. end looking SW.
"B" mill recovery boiler precipitator foundation excavation from near track #14 looking NW.
Excavation for foundation for new liquor spill collecting tank from NE corner looking SW.
Formwork for new capacitor room from top of grade wall at MXE-56 looking NW.
Looking NE. along column line MXA from E. side of NW chest fndn.
S. end of new warehouse looking E. from N. end of "B" mill machine room.
N. end of new warehouse looking NE. from N. end of "B" mill machine room.
Excavating for #2 turbo generator bldg. looking N.
New lime kiln fndn. excavation from N. end looking S.
Staircase from E. side of Power Blr. bldg. at new location on S. of bldg. looking NE.
Fndn for H.D. storage tank looking NE.
Footing for coal MXA-53 looking SE.
Excavation for recaust bldg. extension from N. side looking S.
Excavation at N. end of old lime kiln bldg. from E. side looking W.