Lagoon site from top of sand stock pile looking N.W.
Lagoon site from S.W. corner of existing lagoon looking E.
Water Treatment Clarifier from N. side of Water Treatment Plant looking N.
Lagoon site from top of stock pile looking N.W.
Lagoon site from top of stock pile looking W.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.E.
"B" Mill Machine Room roof from roof of "A" mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
"B" Mill Pulping Group from near Woods Div. building looking S.E.
"B" Mill Power Group from N-S Roadway looking N.E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
30" EMUC-36-060 from Col. line 34P "B" mill Pulping Group looking S.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
"B" mill Pulping Group from N-S roadway looking N.E.
"B" mill Machine Room from Column MXA X 71 looking S.W.
"B" mill Power Group from roof of Recaust building looking N.E.
Deaerator and feedwatr tanks from S. roof of "A" mill Power Group looking E.
Excavation far Utility Bridge Tower T4 looking S.E.
42"EAS-36-001 just W. of Water Treatment Plant looking S.W.
Intersection of 8"S-47-002 and 42"EAS-36-001 looking S.E.
Under ground pipes at S.W. corner of Chip Surge Bin building looking N.E.
"B" Mill Machine Room W. wall looking N.E.
Utility Bridge Bent from W. side looking S.E.
"B" Mill Pulping Group at N.W. corner looking N.E.
Trench at E. side of H.A.S. Field Office looking S.W.
36" WMC-36-149 and 24"EMUC-36-073 risers inside W. wall of "B" Mill Evaporator Building looking S.W.
Recaust W.W.S. pukps aisle area foundations from W. side of 42 swing tank foundation looking N.W.
New Lime Kiln piers from Track #14 looking N.W.
Chip Screen Building excavation and foundations N. looking W.
Chip Screen Building excavation and foundations S. end looking W.
No. 2 and #1 Chip Dumper foundations looking N.E.
Wall on W. side of existing Black Liquor Tanks looking N.E.
Trussed girt on W. wall of "B" Mill pulping group bracing connection looking West.
Trussed girt on W. wall of "B" Mill pulping group column connection looking.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
Unloading digester shell plates near chip silos looking S.E.
Lagoon S. end of culvert under lagoon outlet pipe looking N.W.
Lagoon weir box base slab looking N.W.
Trussed girt on W. wall of "B" Mill Pulping Group bracing connection looking W.
Chip Screen building foundations from S.W. corner lookng N.E.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Fiber Salvage Sump "A" Mill Machine Room looking E.
"B" Mill Pulping Group from #1 Chip Dumper looking N.E.
Temporary cable bridge to #2 Chip Rail Car Dumper looking S.E.
Temporary cable bridge to #2 Chip Rail Car Dumper looking N.W.
Excavation at S.W. corner of Chip Surge Bin building looking N.W.
E. Wall of "B" Mill Power Group looking S.W.