Bob Rinaldi inside the new digester building.
The new digester building next to the old digester building.
Several new buildings, such as the digester tower and the hi-density storage tanks, are constructed during the pulpmill expansion.
A helicopter attaches a pipe to the side of the digester.
(L-R) John Wood and Walter Schmaus stand in the pulp and group control room.
Don Garden examines pulp sheet grading.
Chip truck being unloaded at the truck dump.
Maintenance manager, George Nelson, presents painter Larry Doll with his Journeyman certificate.
Doug Perkins taking a sample of brown stock from discharge of no.2 brown stock washer.
Pulp bales stamped with the Northwood logo.
Overview of B mill brown stock knoters and screens.
Pulp bales stamped with the Northwood logo.
Close up showing size and quality of wood chips needed as the raw materials for the pulp making process.
Close up showing size and quality of wood chips needed as the raw materials for the pulp making process.
An aerial of Northwood Pulp Mill during the expansion.
An aerial of Northwood Pulp Mill during the expansion with the digester towers in the background and the mill complex in the foreground.
Don Garden examines pulp sheet grading.
Kraft pulp sheets made by Northwood.
Sample of brown stock discharge (?)
Aerial view of Corporate Head Office sometime in late fall or early winter.
Northwood Pulp Mill control room.
Close up of control panel.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3 hrs. (3:30 p.m.)
Pulp. Gp. excavation from point near SW corner existing Pulp. Gp. looking SE.
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. NW.
Spoiled. [pipe laid in a ditch]
Pulp. Gp. excavation from point E. of conveyor bent #2 and N. of road look. SW.
M.R. excavation from E. end of walkway looking NW.
View from NW corner of walkway into 3" dia. W.P. excavation (machine room)
Looking E. at E. end of gravel pit. Start of removing over-burden.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3hrs (9:30 a.m.)
E. side Power Gp. looking SW at transformer bank and quick drain tank.
E. side Power Gp. looking SW at concrete block building (Bunker C)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View of excavation for M.R. - North end.
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
Looking SW at R.R. and road crossing, 8" dia. E.S. N. of W.T. Plant.
View looking NE Pulp. Gp. excavation.
View from S. of gate on chip truck road looking S. along new camp access road.
Le Tourneau moving logs.
NW aerial survey marker looking N. along new camp access road.
Looking N. from MH#3 Camp 8" ES.
Brown stock high density tower #2.
Propane vapourizer station - East side Power Group.
Putting in thrust block form 3" WP line West of M.R.
Broken electrical cables in Power Group excavation.
Looking West down trench from 8" WFP-47-100.
Looking S.W. into Power Group excavation.
First 60' section of 42" F.R.P. EAS pipe in place.