"B" mill Power Gr. from roof of chip silo looking N.
Trench for 12" EAS line along N. wall of "A" mill evaporators from E. end looking W.
"B" mill machine room from SE. corner of locker room looking NE.
S. end of "B" mill machine rm. from roof of "A" mill machine rm. looking SW.
"B" mill machine rm. from roof of "A" mill bleached H.D. tank looking N.
Lime kiln precipitator fndn. from track #14 looking SW.
"B" mill Power Gr. from NE. corner looking SW.
N. end of "B" mill Pulping Gr. from roof of chemical unloading shed looking W.
NW. corner of "B" mill Pulping Gr. from roof of "A" mill looking SW.
SW. corner of "B" mill Pulping Gr. from roof of 33rd floor Pulping Gr. looking SW.
Lime kiln precipitator fndn. looking NE.
"B" mill Power Gr. from track #14 looking NW.
S. end of "B" mill Pulping Gr. from roof of chemical unloading shed looking SW.
SW. corner of "B" mill Pulping Gr. from roof of 3rd floor Pulping Gr. looking S.
No. 2 turbo generator building excavation from roof of #50 caustic tower looking E.
N. end of "B" mill machine rm. from roof of "A" mill machine rm. looking NW.
"B" mill machine rm. broke pit from roof of "A" mill machine rm. looking W.
"B" mill Power Gr. from SE. corner of "A" mill Power Gr. building looking NE.
Brown stock & bleached H.D. tanks fndn. slab reinforcing steel - 75 tons "B" mill pulping from SW. corner looking NE.
S. end of tanks from SE. corner of "B" mill Pulping Gr. looking NW.
Warehouse addition from roof of "A" mill machine rm. looking N.
"B" mill machine rm. from roof of "A" mill tank looking N.
N. end of EAS neutralization tank looking SE.
Rerouted fuel oil lines with gilsulate covering N. side of salt cake unloading looking E.
Rerouted fuel oil lines at E. side of existing fuel oil heater building looking NW.
S. end of bleach towers from SE. corner of "B" mill pulping group looking NW.
Knot dump at S. end of "A" mill Pulping Group looking NW.
Forming up W.W. chest looking NE.
Overflow from filter N. end of temporary walkway to "A" mill mach. rm. looking N.
No. 2 T.G. fndn. excavation from roof of #50 caustic tower looking E.
Tracks #17 and #18 from roof of "A' mill machine room looking N.
"B" mill Pulping Group from roof of "A" mill Pulping Group lookins SW.
EAS neutralization tank from N. end looking S.
Rerouted fuel oil lines at NE. corner of "A" mill Power Group looking S.
Retaining wall at S. end of track #14 looking NW.
Hydrant riser of 10" WFP-36-127 at N55 + 85.5 and E31 + 36.
Half way plus, during 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab S. end looking NE.
Rerouted fuel oil lines at NE. corner of "A" mill Power Group looking SW.
Feed end fndn. for new lime kiln looking NW.
Water leak into trench for 6" WFP-36-126 just N. of firehall looking N.
Setting column form looking NE.
8" WFP-36-131 branch off of 10" WFP-36-127 looking NW along trench from N85 + 86 and E32 + 12.5.
Start of 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab N. end looking SW.
"B" mill brown stock & bleached H.D. tanks fndn. slab SW. corner looking NE.
Rapid drain tank at S. end of "A" mill Power Group looking E.
Rerouted fuel oil lines at heater building looking SW.
Anchor for retouted fuel oil lines NE corner of "A" mill Power Group building looking SE.
Lime rock track pit from roof of chip blower house looking N.
Warehouse addition from roof of "A" mill Machine Room looking N.
New lime kiln feed end fndn. looking NW.