Lagoon Site from N.E. corner looking W.
"42" 0 FRP Lagoon inlet pipe at showing gap in pipe looking S.W.
"B" Mill Pulping Group W. wall cladding looking N.E.
"B" Mill Machine Room Bridge Crane from S.E. corner looking N.W.
Temporary cable bridge to #2 Chip Rail Car Dumper looking S.E.
"B" Mill Pulping Group from #1 Chip Dumper looking N.E.
Lagoon S. end of culvert under lagoon outlet pipe looking N.W.
Wall on W. side of existing Black Liquor Tanks looking N.E.
Chip Screen Building excavation and foundations S. end looking W.
Recaust W.W.S. pukps aisle area foundations from W. side of 42 swing tank foundation looking N.W.
36" WMC-36-149 and 24"EMUC-36-073 risers inside W. wall of "B" Mill Evaporator Building looking S.W.
Under ground pipes at S.W. corner of Chip Surge Bin building looking N.E.
42"EAS-36-001 just W. of Water Treatment Plant looking S.W.
Deaerator and feedwatr tanks from S. roof of "A" mill Power Group looking E.
Recaust G.L.C. building addition and #2 W.W.S. and U.W.L.S. tanks from roof of #20 Caustic Tower looking S.E.
Lagoon site from S.W. corner of existing lagoon looking S.E.
Lagoon site from S.W. corner of existing lagoon looking E.
Lagoon site from top of sand stock pile looking W.
Trench for W.F.P. Line from road near Fire Hall looking N.E.
Lime Rock Loader Dump Hopper from W. side looking at S.E. corner.
"B" Mill Recovery B. remodifying tank #13-#14 manway hole for personnel access Nor.
"A" Mill Recaust Tie-in Liquor Inlet Line Modification by DWG CJ-735-413.
"B" Mill Digester. Kamyr/Horton vertomatic welder.
"B" Mill Digester area-inner skin cladding S. wall N.S. road looking N.E.
"B" Mill Pulping Group inner skin cladding S. wall N.S. road looking N.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.W.
South Elevation of Brown Stock building structural steel looking North.
"B" Mill Power Group Construction elevator looking S.
Winter Bridge from S. end looking N.E.
"B" Mill Pulping Group temporary Digester Tower hoist house looking N.W.
Temporary paint shed E. of Quonset warehouse looking N.E.
"B" Mill Machine Room looking S.E.
Recaust - Steam Heating System for Lime Rock Conveyor Hopper looking N.E.
"B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group. Decker Filtrate Storage Tank from W. Wall.
"B" Mill Pulping Group Temporary plastic wall on B.L.34P looking N.E.
"B" Mill Pulping Group. Base for Digester looking N.E.
"B" Mill Power Group E. wall looking W.
"B" Mill Power Group S. wall looking N.
"B" Mill Machine Room floor slab pour at Bay Line 63 looking N.E.
Gravel stock pile from S.E. corner looking N.W.
Winter bridge from S. end looking N.W.
"B" Mill Pulping Group Digester Tower W. wall looking E.
"B" Mill Pulping Group, Digester Tower, N. Wall looking S.
"A" Mill Machine Room Sample Storage Room looking S.E.
"A" Mill Bleached Stock Spill between "A" and "B" Mill broke tanks looking S.E.
"B" Mill Machine Room. Blowers for heating and ventilating system.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.E.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.W.
"B" Mill Pulping Group. Tower top scraper for Bleach Towers.