Lagoon Wier Box from S. ridge looking N.W.
"42" FRP Lagoon inlet pipe at splitter box end looking N.E.
No. 2 Turbo-Generator foundation looking S.W.
"B" Mill Evaporator building foundation looking N.E.
Lagoon site from N.E. corner looking south.
Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
"B" Mill Evap. area phase I of structural steel N.S. central rd. looking S.
"B" Mill Machine Room looking inside S. side of reactor pit.
"B" Mill Machine Room couch pit repulper insert.
Excavation E.W. corridor MH3B, IF, 10" GF, 24" EMC 36-061 4" FS 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207, 8" GF 36-206.
"B" Mill Pulping Group east elevation looking W.
"B" Mill Recaust #5 Weak Wash Tank Metal jacket completed by J. Drexel. Central N.W. road looking E.
E.W. Corridor between power and recaust showing 24" EMUC and 10"GF looking S.E.
"B" Mill recovery Bldg. lifting 1st economizer tube bundles (top) to correct elevator. Looking West.
"B" Mill Machine Room N-S road looking N.E.
"B" Mill Machine Room - 3rd Press Pit steel insert for agitator B/L MXB.
"B" Mill #2 Turbo-Generator Building looking N.
"B" Mill Machine Room - 3rd Press Pit Concrete Wall B/L 60-61, MXB, MXC.
Overflow through Caustic Effluent M/H near Bleach Tower #60 looking S.E.
"B" Mill Power Group Black Liquor Tanks, Evaporator and #2 Turbo Generator Building looking S.E.
Chip Handling Scalping Screen Discharge Chute looking N.W.
Waste materials at putrescible dump looking S.E.
"B" Mill Machine Room air line from "A" Mill Machine Room at Col. line 65 looking N.E.
"B" Mill Machine Room rebar cut in way of anchor bolts looking S.W.
Water Treatment Plant Clarifier looking N.E.