Photographer believed to be Bill Theessen.
Unidentified man working on machine maintenance at Northwood Pulp and Timber.
"B" Mill Machine Room, formwork for Separator Chest base looking S.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
No. 2 Rail Car Chip Dumper Tunnel Excavation looking N.
"B" Mill Machine Room. Sample Storage Room looking S.W.
"B" Mill Pulping Group. ClO2 Plan, ClO2 Generator.
Break in 2" 0 potable water line from Water Treatment Plant to Batch Plant.
No. 2 Turbo-Generator building framing from S.W. corner looking N.E.
No. 2 Rail Car Chip Dumper tunnel excavation looking N.E.
Water Treatment Clarifier looking S.E.
"B" Mill Pulping Group Bridge Crane looking N.W.
Unloading steel for #2 Turbo-Generator building looking N.W.
"B" Mill Machine Room from near Locker Room looking N.E.
"B" Mill Pulping Group from S.W. Corner looking N.E.
"B" Mill Machine Room from W. road looking South East.
"B" Mill Power Group looking South West.
42" 0 FRP Lagoon Inlet Pipe at Splitter Box End looking S.E.
"B" Mill Pulping Group looking North West.
The Pulpmill expansion of the digester tower.
The construction of the digester tower during the expansion of the pulpmill.
The new digester building under construction.
An unidentified pipe is put into place during the pulpmill expansion.
"B" mill machine room from roof of existing blending tank looking N.
"B" mill machine room from roof of "A" mill machine room looking SW.
No. 2 turbo generator foundations from roof of caustic tower #20 looking NE.
Rerouted bunker "C" oil lines along W. side of "A" mill power group looking S.
Looking SW. along new alignment & embankment for track #14.
Ring foundation for 30" LMS> tank and trench for 12" EMC-36-066 & 8" EMUC-36-065 from top of 45 OLS. tank looking NE.
Warehouse addition from near hydrant #4 looking SE.
"B" mill Pulping Group from roof of filter building looking N.
"A" mill Power Group E. wall at column RF-47 ;pplomg NW.
Warehouse addition roof from "A" mill machine room roof looking NW.
Excavation for black liquor storage tanks looking SE.
Warehouse addition W. wall from N. end looking S.
Tracks #17 & #18 from N. wall of warehouse addition looking N.
M.H. 2D and 12" EMUC-36-066 from in front of pump house looking E.
Recaust building addition from roof of chemical unloading shed looking SE.
Warehouse addition from NW. corner looking SE.
Utility bridge tower T1 foundations excavation looking NE.
Utility bridge bent B2 foundation excavation looking SE.
Truck for 42" EAS-36-001 at S. limit of contract C401 looking NE.
H.A.S. field office looking NW.
H.A.S. field office A/C system looking NW.
"B" mill pulping group from roof of chemical unloading shed looking NW.
42" EAS-36-001 joint showing mis-match of 0's looking upstream.
Chip truck dump excavation from top of "A" mill digester looking S.
42" EAS-36-001 near E. mis-match of pipe & ell looking upstream.
New lime kiln foundations from track #14 looking NW.
Utility bridge bent #B7 looking NW.