Lagoon from S.E. corner looking N.
Defective weld on Bleach Washer Inlet Vat.
Defective weld on Bleach Washer Inlet Vat.
Defective weld on Bleach Washer Inlet Vat.
Lagoon site from MCC location looking West.
Lagoon site from MCC location looking S.W. by W.
Lagoon site from MCC location looking S.E. by S.
Lagoon site from MCC location looking S.
Lagoon site from MCC location looking S.E. by S.
Dumping rip-rap on dyke near S.W. corner of Lagoon looking N.W.
Placing rip-rap on dyke near S.W. corner of Lagoon looking N.W.
Lagoon from Wier Box looking North.
Lagoon from Wier Box looking North East.
Lagoon from Wier Box looking South East.
Lagoon from Wier Box looking South.
Defective weld on Bleach Washer Inlet Vat.
Defective weld on Bleach Washer Inlet Vat.
"B" Mill Power Group from Track #14 looking N.W.
"B" Mill Pulping Group from near #1 Chip Dumper looking N.E.
Tert pit at Lagoon site S. side looking N. along E40+00.
"B" Mill Digester Tower from W. Side looking N.E.
Inside Warehouse addition from S.W. corner looking N.
N. wall of "B" mill Machine Room from N.W. corner looking S.E.
W.wall of "B" mill Machine Room from N.W. corner looking S.E.
W.W.S. and W.L.S. Tanks from roof of Chemical Unloading Shed looking S.E.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
"B" Mill Pulping Group from roof of "A" Mill Pulping Group looking W.
Green Liquor Clarifier bldg. addition from top of Caustic Tower #50 looking S.E.
No. 2 Turbo Generator building from top of Caustic Tower #20 looking E.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking S.W.
"B" Mill Machine Room from roof of "A" Mill Blending Tank looking N.
"13" Mill Power Group from between Tracks #5A & #5B looking S.W.
8" VEN-36-280 FRP line looking N.E.
Lime Kiln Control Room addition from S. wall of "A" Mill Power Group looking S.E.
Lime Kiln Control Room addition from W. wall of "A" Mill Power Group looking S.
"B" Mill Power Group from under Hog Conveyor gallery looking N.W.
Lime Rock Conveyor looking N.W.
Chip Flinger Tower pour looking N.E.
Water Treatment Clarifier from E. Side looking S.W.
Over Burden dump at worked out gravel pit S. side looking W.
Putrescible dump from S. side looking N.E.
Excavation for Water Treatment Clarifier looking W.
Lagoon site from N23+00 and E41+80 looking W.
Lagoon site from N23+00 and E41+80 looking S.W.
Lagoon site from N23+00 and E41+80 looking S.
Lagoon site from N23+00 and E41+80 looking S.E.