No. 2 Rail Car Chip Dumper Tunnel Excavation looking S.
"B" Mill Machine Room looking N.W.
"B" Mill Machine Room Sample Storage Room looking S.W.
"B" Mill Pulping Group. 13'-6X26'-0 Bleached stock vacuum washer drum.
"B" Mill Pulping Group. Impco single shaft steam mixers.
"B" Mill Power Group looking S.W.
"B" Mill Pulping Group looking N.E.
Water Treatment Clarifier looking S.E.
"B" Mill Power Group from Track #14 looking N.
"B" Mill Power Group E. Wall looking N.W.
"B" Mill Power Group looking N.W.
Lime Kiln Piers from track #14 looking N.W.
"B" Mill Machine Room from N-S road looking N.E.
"B" Mill Pulping Group from N-S road looking N.E.
Roof beams for "B" Mill Pulping Group looking N.W.
"B" Mill Pulping Group from track #9 looking N.W.
"B" Mill Pulping Group from near Woods Div. Bldg. looking South E.
Weather protection cover for welding digester sections.
Soap Skimming and Storage Tanks from F.O. Day Tank dyke looking S.W.
"B" Mill Machine Room from near Locker Room looking North East.
Lime Kiln Section looking South East.
Roof of weather protection enclosure for welding up digester sec.
Dennis Matson, Member of Expansion Team and Technical Superintendent, stands beside a row of washer drums.
An aerial of Northwood Pulp Mill during the expansion with the construction occurring in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the mill in the background and the parking lot in the foreground.
The newly constructed chip silos.
The new digester building.
The construction of the new digester tower.
A helicopter attaches a pipe to the side of the digester.
An aerial view of the Northwood Corporate office, with a forested area and a road in the background, the office in the midground and the parking lot in the background. Photographer of this oversized photograph is believed to be Bill Theessen.
Four men on a stairwell in Corporate Head Office (L-R): Mike Madrigga, unidentified, W.A. Matson, unidentified.
Forest covered mountain in winter.
Chip silos.
Title slide for fire training visual aid material.
Photograph featuring an unidentified mining camp (?)
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3 hrs. (3:30 p.m.)
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
View from S. of gate on chip truck road looking S. along new camp access road.
North chip conveyor bent support.
West leg, North bent of chip conveyor looking S.E.
Chip dumper - looking N.
Looking along trench from camp ES #5 MH to Lift Station.
Spirogester tank, looking S.
Pulping Group excavation - looking N.
From roof of Digester - looking S.W.