"B" mill Pulp Gr. from roof of #1 FWL tank looking NW.
"B" mill Pulp Gr. from roof of O.L.S. tank looking NW.
Dillinghams field offices from SE. corner of site looking NW.
Construction camp from E. end of woodroom roof looking S.
"B" mill Power Gr. from SW. corner looking NE.
Construction camp from W. end of woodroom roof looking SE.
Trench for rerouted services to admin. bldgs. from W. end looking E.
"B" mill Pulp Gr. from roof of #1 WWS tank looking NW.
"B" mill Power Gr. from SE. corner looking NW.
"B" mill machinery room from roof of blending tank looking N.
"B" mill machinery room from roof of bleached H.D. tank looking N.
Construction camp kitchen.
Retaining wall at fuel oil day tank.
New kiln location.
Dillingham pre-fab area.
Construction camp kitchen.
Temporary walkway to "A" mill.
Foundation for boiler rapid drain tank. New location.
H.A.S. field office.
Construction camp kitchen.
"B" mill MR from roof of bleached H.D. tank.
At til in GF2
Condition of pipe under Polykin.
8" pipe 45 degrees ell.
8" pipe straight.
8" pipe 90 degrees ell.
Shipping damage [to piping].
At tie in GF1
Shipping damage [to piping].
Shipping damage [to piping].
Condition of pipe under Polykin tape.
Condition of pipe under Polykin tape.
Condition of pipe under Polykin.
GF riser @ power GR. GF2.
Neutralization tank excavation.
GF riser @ power GR. GF2.
10" plug valve @ tie in GF#1.
36" x 39" WMV tie in WMC#1.
12" tie in GF#1.
6" tie in GF#3.
MR floor.
1.5" tie in GF#6.
Excavation for lime rock unloading facility looking N.
Dillinghams batch plant looking NE.
Dillinghams aggregate procuring plant at gravel pit looking N.
Neutralization tank looking N.
Machine room from roof of #2 blow tank looking North.
Pulping Gr. from roof of #2 blow tank.
Pulping Gr. from roof of #2 blow tank showing new digester fndn. looking SE.
Room roof of Bleached H.D. tank looking N.