Stack of pulp bales at end of finishing line.
Stacks of pulp bales on the dock.
Harbour crane lifting paper onto ship.
Stacks of pulp bales within a ship hull.
Harbour crane unloading (?) last pallet of pulp bales from a ship hull.
Pulp bales in a ship hull.
Aerial of a ship at the Vancouver Harbour being loaded with pulp bales.
Two unidentified employees (one from Stal-Laval?)using a large pipe as a lever to shift the turbine into place (?)
Hydraulic crane lifting portion of turbine into place, one employee guides the crane while another two stand by.
Installation of a portion of the turbine.
Overview of Stal-Laval crates on railcars at Northwood.
Crane lifting component of Stal-Laval turbo generator in the rail yard.
Crane lifting Stal-Laval turbo generator components.
Crane liftine a Stal-Laval turbo generator component off of a pallete.
Chip truck unloading load next to chip pile.
Close up of one truck being unloaded via the hydraulic chip dump, another waiting.
Digging arm at chip dump, steam recovery plant in background.
Chip railcar unloading at Northwood in the winter.
Chip railcar unloading at Northwood in the winter.
Log decks and chip pile.
British Columbia railcar at Northwood rail dump.
CN railcar unloading chips.
Woodroom line.
Conveyor belt for chips from silo.
Chip screens.
Unidentified machinery in wood room.
Heavy duty machiner unloading wood chips (?)
Unidentified machinery in the wood room.
Le Tourneau log loader used to unload logging trucks.
Five unidentified employees meeting in the pulp mill control room.
Unidentified employee standing next to computer server stations (?)
Morris Powel, Pulp & Group Operator, in the newly expanded pulp control room after it changed to DCS.
Computer terminals in the new control room.
Unidentified man standing at control panel within the control room.
Unidentified man standing at a control panel within the control room.
Jim Sai in control room.
Micky Smuyehuk (?) shutting down brown washers in the control room.
Tony Sakamoto at the H2S Monitor.
Seven Northwood employees seated around a meeting table.
Six Northwood employees seated around a meeting table [L-R on left side of table]: Unidentified, Ernie Poppinga, Martin Vanderstaap, Bill Minenko; [L-R on right side of table] Adrian Girard, Paul Straub.
Preparatory welding to the digester (?)
Seam welding on the recaustizing tanks.
Carpenter crew cutting forms for top section of pulper.
Reinforceing steel crew on area 2 of pulper.
Forming base for tanks onlower floor of recovery building.
Close-up of reinforcing steel crew on top of pulper and digester.
Preparing land for construction of bio-basin.
Aerial of land cleared for Northwood construction.