Canrons 165 ton crawler crane.
42" EAS-36-001 joint showing mis-match of 0's at 38+90 looking upstream.
42" EAS-36-001 joint showing mis-match of 0's after partial layings S. side.
View of new bridge approach from top of "A" mill digester looking E.
Foundations for clean fiber salvage tank at SE. corner of "B" mill pulping group looking N.
New kiln drive pier from SW. corner looking NE.
Inside warehouse addition, NE. corner looking SE.
Warehouse addition from NW. corner looking SE.
Draining pump discharge line pump from mill bleach plant W.W. chest looking SE.
42" EAS-36-001 near N54+80 looking NE.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Finished field joint on 42" EAS-36-001 at N55+09 looking SE.
"B" mill power group from NE. corner looking SW.
"B" mill power group from track #6 near salt cake unloading looking SW.
8" EMUC-36-065 and 6" WMC-36-147 from existing lime rock conveyor looking N.
Lime rock railcar dump pit from top of lime rock pile looking NE.
No. 2 turbo-generator bldg. from roof of recaust bldg. looking N.
"B" mill evaporators building foundations from roof of engineering offices looking SE.
View from lagoon site.
View from lagoon site.
8" EMUC-36-065 and 6" WMC-36-147 from N. end looking S.
Combustion engineering boiler sections from track #5A looking NE.
Trench for 4" ES-36- and 6" ES-36-081 from about col. line 71A "B" mill machine room looking SW.
30" EC-36-040 from SW. corner of "B" mill pulping group looking N.
Excavation for belt conveyor #3 and chip screen bldg. looking S.
No. 2 turbo-generator bldg. foundations from roof of #20 caustic tower looking E.
Lagoon site from N23+34 & E41+82 looking SE.
Lagoon site from N23+34 & E41+82 looking SW.
Lagoon site from N23+34 & E41+82 looking S.
Black liquor storage tanks from roof of engineering bldg. looking SE.
"B" mill machine room roof from roof of "A" mill machine room looking NW.
Lagoon site from N19+00 & E46+00 looking SW.
Lime rock conveyor from NE corner of lime rock dump hopper looking NW.
Lagoon site from N23+34 & E41+82 looking E.
Lagoon site from N23+34 & E41+82 looking SW.
10EA - 36-007 from N. end of trench looking S.W.
"B" Mill Power Group looking S.W.
Brown Stock spill at N.E. corner "A" Mill Bleach Plant looking W.
Black Liquor Tanks from roof of Warehouse looking S.E.
No. 2 Turbo-Generator building foundations from top of Caustic #20 Tower looking N.E.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking W.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
Lagoon site from N23+00 and E41+80 looking E.
Lagoon site from N23+00 and E41+80 looking S.
Lagoon site from N23+00 and E41+80 looking W.
Lime Rock Conveyor looking N.W.
"13" Mill Power Group from between Tracks #5A & #5B looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking S.W.
"B" Mill Machine Room from roof of "A" Mill Machine Room looking N.W.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.