Compacting backfill along E. side of bleach towers from 23 NaOH tank looking SW.
Contaminated fiber & B.L. sump foundation from Col. PBI x 36P looking SW.
"A" mill knot dump from "B" mill Pulping Group Col. PxCx40P looking NE.
"B" mill machine room from roof of bleached H.D. tank looking N.
12" GF-36-202 from #2 T.G. building excavation looking NW.
Trench at NW. corner of chip blower building to retoute air, water & electrical lines, looking SE.
Looking S. along E. side of contaminated fiber and B.L. foundation, "B" mill Pulping Group.
Track #5B from N66+20 looking N.
"B" mill machine room from NW. corner looking SE.
"B" mill Pulping Group S. end from roof of chemical unloading shed looking SW. (8:02 a.m.)
"B" mill Power Group from roof of existing lime kiln building looking NE. (8:18 a.m.)
"B" mill machine room from N.W. corner looking SE.
Warehouse addition from NW. corner looking SE.
Lime rock conveyor hopper ramp W. end looking SE.
Lime rock conveyor hopper ramp W. end looking NE.
MCC 16-1 and MCC 14-5 S. side.
MCC 16-1 and MCC 14-5 N. side.
Electrical & phone conduits to water treatment plant from SW. side of chip conveyor bent looking NE.
MCC 14-4 W. face S. side.
MCC 14-4 E. face S. side.
"B" mill Pulping Group SE. corner looking NW.
First steel "B" mill Power Group from hog conveyor tower looking NW.
S. end of soap loading track looking NE.
"B" mill machine room from roof of existing "A" mill blending tank looking NW.
New lime kiln foundations from track #14 looking NW.
Excavation at E55+50 for 24" WMC-36-142, 30" EMUC-36-060, 30" EC-36-040 looking NE.
Repairing leak in 36" EAW line at N61+75 looking N.
Relocated air, water & elec. lines between filter bldg. & chip slur.
"B" mill Pulping Group S. end from roof of chemical unloading shed looking SW.
Looking SW. along new alignment and embankment retaining wall for track #14.
Excavation for M.H.1D looking SE.
Warehouse addition roof from "A" mill machine room roof looking N.
"B" mill machine room from roof of "A" mill bleached HI. Density Tank looking N.
Excavation & foundation for utility bridge bent #B7 from roof of existing recaust bldg. looking SW.
Ring foundation for 42' No.2 WWS. and WLS. tanks from top of 45' No.1 FWL. looking NW.
"B" mill machine room from enar sub-station looking SE.
Excavation for 60" chip conveyor along W. side of chip silos looking NW.
Lime kiln foundations from top of lime rock bucket elevator looking N.
"B" mill Power Group from SE. corner of salt cake unloading building looking SW.
42" EAS-36-001 at S. limit of contract 401 looking N.
Putrescible dump from SW. bank looking N.
"B" mill pulping group from roof of chemical unloading shed looking W.
"B" mill pulping group from roof of chemical unloading shed looking SW.
"B" mill blending tank & broke tank foundation looking E.
"B" mill power group looking SW.
Foundations fof #2 turbo-generator building from roof of #1 turbo-generator building looking NW.
Recaust building addition excavation from roof of #1 turbo-generator building looking SW.
View of new bridge approach from top of "A" mill digester looking E.
"B" mill machine room from top of "A" mill digester looking N.
Utility bridge bents #T1 & #T2 from top of "A" mill digester looking N.