Condition of pipe under Polykin tape.
Condition of pipe under Polykin tape.
Condition of pipe under Polykin.
MR floor.
1.5" tie in GF#6.
Room roof of Bleached H.D. tank looking N.
Retaining wall at fuel oil day tank looking N.
Precipitation bldg. excavation from NW corner looking SE.
Kiln foundation excavation S. end looking N.
Lime rock track pit from roof of chip surge bin bldg looking N.
"B" mill recovery boiler precipitator foundation excavation from near track #14 looking NW.
Excavation for foundation for new liquor spill collecting tank from NE corner looking SW.
Applying insulation on existing weak B.L. tank.
Lime rock track pit from W. end looking E.
Pouring fndn for tanks along E. wall of "B" mill Pulping Gr. from S. end looking N.
Demolished retaining wall at "A" mill Pulping Gr. knot chute E. end looking NW.
S. end of "B" mill machine room from S. end looking N.
"B" mill machine room broke pit from roof of "A" mill machine room looking W.
Excavation for new B.L. tanks and "B" mill evaporator bldg. from roof of existing warehouse looking S.
Excavation at N. end of existing lime kiln bldg. looking SW.
Hydrant # at E. side of hog fuel conveyor tower looking NW.
Machine rool accident S. end of "A" mill machine room.
SE. corner of "B" mill Power Gr. from walkway at E> wall of "A" mill Power Gr. looking SE.
"B" mill Power Gr. from roof of chip silo looking N.
Trench for 12" EAS line along N. wall of "A" mill evaporators from E. end looking W.
Brown stock & bleached H.D. tanks fndn. slab reinforcing steel - 75 tons "B" mill pulping from SW. corner looking NE.
S. end of tanks from SE. corner of "B" mill Pulping Gr. looking NW.
Warehouse addition from roof of "A" mill machine rm. looking N.
"B" mill machine rm. from roof of "A" mill tank looking N.
N. end of EAS neutralization tank looking SE.
Rerouted fuel oil lines with gilsulate covering N. side of salt cake unloading looking E.
Rerouted fuel oil lines at E. side of existing fuel oil heater building looking NW.
8" WFP-36-131 branch off of 10" WFP-36-127 looking NW along trench from N85 + 86 and E32 + 12.5.
Start of 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab N. end looking SW.
"B" mill brown stock & bleached H.D. tanks fndn. slab SW. corner looking NE.
Rapid drain tank at S. end of "A" mill Power Group looking E.
Rerouted fuel oil lines at heater building looking SW.
Anchor for retouted fuel oil lines NE corner of "A" mill Power Group building looking SE.
Lime rock track pit from roof of chip blower house looking N.
Warehouse addition from roof of "A" mill Machine Room looking N.
Tie-in location at N. end of 8" WFP-36-125 looking SE.
"A" mill Power Group staircase on E. wall looking SW.
Warehouse addition south end looking SE.
Mill from hill on Pulp Mill Road looking NE. 35mm lens.
Mill from hill on Pulp Mill Road looking NE. 210mm lens.
24" EM-36-062 tie-in to M.H. #86 looking E.
Warehouse addition from NE. corner looking SW.
"B" mill Power Group from track #14 looking NW.
"B" mill machine room first steel W. side looking NE.
Canron's 165 ton crawler crane.