Unidentified man at control panel.
Unidentified man talking on the telephone within the control room.
Unidentified man working at a control panel.
Unidentified man at a control panel.
Tom Skinner and an unidentified millwrite engage in pre-shutdown discussions.
Beverely (?) checking for CL2 leaks, dome valves on #2 CL2 car.
Graham Daniel, Machine Tender, at his controls in the wet end.
Unidentified man standing next to a number of tables labelled "shutdown in planning".
Placing outside wall to shap (?) and stone build.
Reinforceing crew on top floor of pulper.
Setting welding work crew (?) in position on top floor of pulper building.
Aerial of Security and front office under construction.
Preparing land for construction of bio-basin.
Bulldozer leveling land.
Section of cleared land against a forest backdrop, piles of logging debris being burnt in preparation for Northwood construction.
Exterior shot of Northwood corporat office in winter.
Northwood Pulp Mill Road in winter.
Hill side off of Northwood Pulp Mill Road in winter.
Overview of washers.
Washer arriving on flat bed truck.
Close-up of end of washer.
"B" mill Power Gr. from SE. corner of "A" mill Power Gr. building looking NE.
Hydrant riser of 10" WFP-36-127 at N55 + 85.5 and E31 + 36.
Half way plus, during 1200 cubic yards poured for brown stock and bleached H.D. tanks fndn slab S. end looking NE.
Rerouted fuel oil lines at NE. corner of "A" mill Power Group looking SW.
Feed end fndn. for new lime kiln looking NW.
Water leak into trench for 6" WFP-36-126 just N. of firehall looking N.
Setting column form looking NE.
Staircase on E. wall of "A" mill recovery boiler bldg. looking SW.
"B" mill Pulping Group bleach towers from SE. corner looking NW.
"B" mill Pulping Group bleach towers from S. end looking NE.
"B" mill Pulping Group from SW. corner looking NE.
Knot dump "A" mill Pulping Group looking W.
"B" mill Pulping Group from col. PCI-32P looking NW.
"B" mill machine room from W. side looking SE.
"B" mill machine room from SW. corner looking NE.
Track #14 X. end retaining wall looking NW.
Lime rock track pit and conveyor hopper ramp from roof of 30' LMD tank looking SE.
S. end of warehouse addition looking SE.
Glulam beam for warehouse addition roof.
Fndn. ring far 42' W.W.S. tank from roof of existing 45' O.L.S. tank looking NE.
Warehouse addition roof S. end , from existing warehouse roof looking SW. (3:30 p.m.)
"B" mill machine room from roof of bleached H.D. tank looking N.
Canron's 165 ton crawler crane.
Power pole carrying O/H 15KV line to water treatment plant looking SW.
24" EMUC-36 at E. wall of "A" mill bleach plant.
Foundation excavation for soap skimmer and storage tanks from NW. corner of fuel oil day tank berm looking SW.