CN railcar unloading chips.
Flakt air pulp dryer.
Brown stock decker.
Overview of the pulp mill warehouse; CN railcars visible.
Log decks - chip piles and pulp mill in background.
Stacked, wrapped and tied bales of pulp.
Unidentified employee working on the baling line.
Brown stock washer.
File contains correspondence, several reports, material regarding trade resolutions with the United States, and various other material.
Mead CorporationPreparing land for construction of bio-basin.
Unidentified scientist at work in a lab.
Dr.Joe Mueller.
Dr.Joe Mueller (left) standing with Paul Temoin.
Preparing land for construction of bio-basin.
Unidentified scientist at work in a lab.
Northwood corporate office in winter.
Northwood corporate office in autumn.
Micky Smuyehuk (?) shutting down brown washers in the control room.
Tony Sakamoto at the H2S Monitor.
Ed Aho and Beverely (?) look at entry to chemical unloading signage which reads: "No Smoking" ; "Authorized personnel only beyond this point" ; "Eye protection area wear goggles".
Tom Skinner and an unidentified millwrite engage in pre-shutdown discussions.
Beverely (?) checking for CL2 leaks, dome valves on #2 CL2 car.
Graham Daniel, Machine Tender, at his controls in the wet end.
Unidentified female pulp tester tagging out #2 brown washer.
Ed Aho standing next to sign: "Danger: do not dip caustic cars or trains with aluminum poles an explosion may occur".
Dennis Matson, Member of Expansion Team and Technical Superintendent, stands beside a row of washer drums.
An aerial of Northwood Pulp Mill during the expansion with the construction occurring in the foreground.
An aerial of Northwood Pulp Mill during the expansion with the mill in the background and the parking lot in the foreground.
The newly constructed chip silos.
The new digester building.
The construction of the new digester tower.
A helicopter attaches a pipe to the side of the digester.
Mobile Bark Separator.
Pulp grader, Peter Girard, cutting pulp sheets for testing.
Wrapped and stamped kraft pulp sheets made by Northwood.
Unidentified employee using a fire extinguisher to put out an outdoor fire.
Northwood Pulp Mill control room.
Lab tester Marianne Dixon measures pulp fiber strengths using the Thwing tester.
View of new control room post mill expansion. Seated with back turned is Nells Kristenson (group operator).
The new digester building under construction.
An unidentified pipe is put into place during the pulpmill expansion.
Mobile Bark Separator.
Les Murphy shows off his Quality Assurance System certificate.
Maintenance manager, George Nelson, presents painter Larry Doll with his Journeyman certificate.
Chip truck being unloaded at the truck dump.
Wrapped, stacked and stamped kraft pulp sheets made by Northwood.
Close up of kraft pulp sheets made by Northwood.
Northwood Pulp Mill control room.