"A" mill power group, E. wall from hog conveyor tower looking W.
Foundation forms for "B" mill blending tank and broke tank looking NW.
N. end of walkway on E. wall of "A" mill Power Group floor E1 1932.5 at Col. RF47 looking N.
Doorway on S. side of "A" mill Power Group just W. of Col. RF45 floor E1 1916.5 looking N.
First steel "B" mill Pulping Group Col. PA2-38P from E. wall looking W.
24" WMC-36-142, 30" EMUC-36-060 & 30' EC-36-040 at about E35+50 looking NE.
Track #5A from N 66+75 looking N.
"B" mill Power Group from NE corner looking SW.
Warehouse addition from "A" mill machine roof looking N.
"B" mill Pulping Group from E. side looking W.
Excavation for M.H. 1D looking N.
30" EC-36-040 at S. end of "B" mill Pulping Group looking NE.
Leak in 36" EAW line at N61+75 looking W.
24" WMC-36-142, 30" EC-36-040 at about E 35+50 looking NE.
"B" mill Pulping Group N. end from roof of chemical unloading shed looking W.
"B" mill Power Group from near hog conveyor tower looking W.
"B" mill machine room from roof of existing blending tank looking N.
"B" mill Pulping Group from stairs on S. wall of "A" mill Pulping Group looking S.
Track #14 from about N62+50 looking N.
24" EMUC-36-062 at "A" mill machine room wall looking N.
Foundations for "B" mill blending and broke tanks looking NW.
24" WMC-36-142, 30" EC-36-040 & 30" EMUC-36-060 at about E35+50 looking NW.
Excavation for 60" chip conveyor along W. side of chip silos looking S.
"B" mill recovery boiler support column.
1800 gal. propane tank in new location on N. side of fuel oil day tank looking SE.
SE. corner of "B" mill machine room from top of "A" mill blending tank looking N.
Excavation for utility bridge foundation B2 looking E.
Warehouse addition NE. corner looking E.
Backfilled trench for 24" EMUC-36-062 in "A" mill bleach plant looking W.
6" WFP relocation at SE. corner of "A" mill power group looking SW.
Track #14 from SE. corner of "B" mill power group looking NE.
"B" pulping group from NW. corner looking SE.
Canrons 165 ton crawler crane.
42" EAS-36-001 joint showing mis-match of 0's at 38+90 looking upstream.
42" EAS-36-001 joint showing mis-match of 0's after partial layings S. side.
View of new bridge approach from top of "A" mill digester looking E.
Foundations for clean fiber salvage tank at SE. corner of "B" mill pulping group looking N.
New kiln drive pier from SW. corner looking NE.
Inside warehouse addition, NE. corner looking SE.
Warehouse addition from NW. corner looking SE.
Draining pump discharge line pump from mill bleach plant W.W. chest looking SE.
42" EAS-36-001 near N54+80 looking NE.
Suspended slab SE. corner "B" mill mach. rm. looking N.
Finished field joint on 42" EAS-36-001 at N55+09 looking SE.
"B" mill power group from NE. corner looking SW.
"B" mill power group from track #6 near salt cake unloading looking SW.
8" EMUC-36-065 and 6" WMC-36-147 from existing lime rock conveyor looking N.
Lime rock railcar dump pit from top of lime rock pile looking NE.
No. 2 turbo-generator bldg. from roof of recaust bldg. looking N.
"B" mill evaporators building foundations from roof of engineering offices looking SE.