Looking E. at E. end of gravel pit. Start of removing over-burden.
View of trench for 8" dia. E.S. from camp at about E 31+00 Approx. 200' of trench in 3hrs (9:30 a.m.)
E. side Power Gp. looking SW at transformer bank and quick drain tank.
E. side Power Gp. looking SW at concrete block building (Bunker C)
View from NW corner of walkway into 3" dia. W.P. excavation (machine room)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View of excavation for M.R. - North end.
Looking N. along 3" dia. W.P. line W. of M.R. excavation.
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View looking NE Pulp. Gp. excavation.
Looking SW at R.R. and road crossing, 8" dia. E.S. N. of W.T. Plant.
View from S. of gate on chip truck road looking S. along new camp access road.
NW aerial survey marker looking N. along new camp access road.
Le Tourneau moving logs.
Looking N. from MH#3 Camp 8" ES.
Brown stock high density tower #2.
Propane vapourizer station - East side Power Group.
Putting in thrust block form 3" WP line West of M.R.
Broken electrical cables in Power Group excavation.
Looking West down trench from 8" WFP-47-100.
Looking S.W. into Power Group excavation.
First 60' section of 42" F.R.P. EAS pipe in place.
First 60' section of 42" F.R.P. EAS pipe in place.
North chip conveyor bent support.
42" F.R.P. EAS pipe looking S. from about N 60 + 25.
West leg, North bent of chip conveyor looking S.E.
Cat hauling pedestal & footing for East leg of North bent of chip conveyor.
Support pile for power pole at West side of south bent of chip conveyor.
Looking S.E. from North end of Pulping Group excavation.
Looking North along 30" EAS trench from about N61 + 60.
Chip conveyor North bent looking S.E.
Chip conveyor center bent looking S.E.
M.R. backfilling - looking North.
Chip car unloader - looking S.S.W.
Chip car unloader - looking N.N.W.
Chip dumper - looking N.
Scenic shots from road to Mill
Scenic shots from road to Mill
Scenic shots from road to Mill
Scenic shots from road to Mill
Pulping Group excavation - looking at N.W. corner W. of center bent.
View looking S.E. of gravel pit.
View looking S.W. of gravel pit.
Looking along trench from camp ES #5 MH to Lift Station.
Spirogester tank, looking S.
Spirogester tank, looking W. along ES trench.
North bent chip conveyor - looking N.
Pulping Group excavation - looking N.
36" WMC trench - looking S. from N63 + 75.
36" WMC trench at 15" EA break.