42" 0 FRP Lagoon inlet pipe from looking S.
Lagoon Site from N.E. corner looking S.W.
"B" Mill Pulping Group from Col. line 32P looking N.
"B" Mill Pulping Group from near Woods Division Building looking S.E.
B.L. Tanks from in front of Maintenance Shops looking S.E.
Capacitator and X fmr Rooms "B" mill Machine Room looking S.E.
Temporary cable bridge to #2 Chip Rail Car Dumper looking N.W.
Chip Screen building foundations from S.W. corner lookng N.E.
Trussed girt on W. wall of "B" Mill Pulping Group bracing connection looking W.
Lagoon weir box base slab looking N.W.
Unloading digester shell plates near chip silos looking S.E.
Trussed girt on W. wall of "B" Mill pulping group bracing connection looking West.
Chip Screen Building excavation and foundations N. looking W.
Trench at E. side of H.A.S. Field Office looking S.W.
"B" Mill Machine Room W. wall looking N.E.
Excavation far Utility Bridge Tower T4 looking S.E.
"B" mill Pulping Group from N-S roadway looking N.E.
30" EMUC-36-060 from Col. line 34P "B" mill Pulping Group looking S.
"B" Mill Power Group from N-S Roadway looking N.E.
"B" Mill Pulping Group from near Woods Div. building looking S.E.
Lagoon site from top of stock pile looking N.W.
Water Treatment Clarifier from N. side of Water Treatment Plant looking N.
Looking E. down South dike from aoubt TP19.
Spoil area at worked out gravel pit looking S.E.
Water boiling up at about N. and E.
Tert pit along south dyke looking N.
24" EMUC-36-062 outlet from Fiber Salvage Sump looking E.
Fiber Salvage Sump looking N.E.
"B" Mill Machine Room, south side of wire silo showing position of fan pump suction.
"B" Mill Turbo-Generator inner skin cladding N.S. central rd. looking N.
Excavation E.W. corridor MH3B, IF, 10" GF MH, 24" EMC 36-061 4" ES 36-083 2 valves on 6" WFP 36-130, 1 gas riser on 6" GF 36-207 and gas riser on 8" GF 36-207 looking S.E.
"B" Mill Excavation 23"ULD 36-240 and 241, 12" EA 36-009 central N.S. rd. looking S.E.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF MH.
Excavation E.W. corridor power-recaust 4"ES, 24" EMC-36-061 MH3B, Gas 10"GF West.
"B" Mill digester. Kamyr/Horton vertomatic welder.
E.W. corridor between power and recaust showing 24"EMUC & 10"GF, looking N.E.
"B" Mill Recovery Bldg. lifting 1st economizer tube bundles to correct elevators looking west.
Recaust - Piping between W.L.S. Tank and #3 L.M.W. Tank looking N.W.
Insulate 1/2" 0 steam trace line existing from 4" 0 mud line going to 30" 0 EAS line from "A" mill pulp. grp. looking N.W.
"B" Mill Pulping Group lifting section of Caustic Tower #20 in place looking N.
"B" Mill Pulping Group temporary digester Tower hoist block looking N.E.
"B" Mill Machine Room steel beam bracket at column MA X 56.
"B" Mill Machine Room Temporary Steam Heaters at Column MXA X 62 looking S.E.
"B" Mill Pulping Group temporary Digester Tower hoist looking N.W.
Rebuilt foam tower looking S.E.
"A" Mill Machine Room roof looking S. along E. wall.
"B" Mill Power Group. Trench formwork along E. wall of "A" Mill Power Group looking N.W.
"B" Mill Pulping Group Bleach Towers #10 and #20 from Track #9 looking N.W.
Foundation for utility bridge tower #5 looking S.E.
Gravel stock pile from W. end looking S.E.