Showing 171 results

Archival description
"Activity 5: Assessment of Benefits. Framework for Assessing the Benefits of the Proposed Nechako River Cold Water Release Facility" prepared by Robinson Consulting and Associates, Ltd.
"Activity 5: Assessment of Benefits. Framework for Assessing the Benefits of the Proposed Nechako River Cold Water Release Facility" prepared by Robinson Consulting and Associates, Ltd.
Alcan Aluminum Ltd., Annual Report, 1999
Alcan Aluminum Ltd., Annual Report, 1999
Alcan Aluminum Ltd., General Promotional Material
Alcan Aluminum Ltd., General Promotional Material
Alcan Aluminum, Ltd: "Alcan Facts, 1999"
Alcan Aluminum, Ltd: "Alcan Facts, 1999"
Alcan and BC Hydro Joint News Release
Alcan and BC Hydro Joint News Release
Alcan British Columbia, "Performance" 1999 & 2000
Alcan British Columbia, "Performance" 1999 & 2000
Alcan Inc. Annual Report, 2001
Alcan Inc. Annual Report, 2001
Alcan: "Indigenous Peoples Policy" and "Operating Principles"
Alcan: "Indigenous Peoples Policy" and "Operating Principles"
Alcan: "Ingot, vol. 47, no. 07"
Alcan: "Ingot, vol. 47, no. 07"
Alcan Legal Agreements, 1997-1999
Alcan Legal Agreements, 1997-1999
"Alcan Primary Metal Group: Kitimat Works' Contribution to the Economy of British Columbia: 1998" prepared by Price Waterhouse Coopers
"Alcan Primary Metal Group: Kitimat Works' Contribution to the Economy of British Columbia: 1998" prepared by Price Waterhouse Coopers
Alcan "Tahtsa Narrows Project Scoping Report" (draft)
Alcan "Tahtsa Narrows Project Scoping Report" (draft)
"Alcan, Pechinery, algroup - Creating a New Global Leader in Aluminum and Packaging: Background to the Proposed Merger"
"Alcan, Pechinery, algroup - Creating a New Global Leader in Aluminum and Packaging: Background to the Proposed Merger"
"Alcan's Contribution to BC's Economy" by Richard Prokopanko
"Alcan's Contribution to BC's Economy" by Richard Prokopanko
"Anticipated Benefits from the Proposed Cold Water Release Facility at Kenney Dam: Draft #4" prepared by the Fraser Basin Council
"Anticipated Benefits from the Proposed Cold Water Release Facility at Kenney Dam: Draft #4" prepared by the Fraser Basin Council
"Backgrounder: Potential Downstream Hydrographs from Alternate Water Release Facilities at Kenney Dam" prepared by Nechako Enhancement Society
"Backgrounder: Potential Downstream Hydrographs from Alternate Water Release Facilities at Kenney Dam" prepared by Nechako Enhancement Society
"Basin News: The Newsletter of the Fraser Basin Council"
"Basin News: The Newsletter of the Fraser Basin Council"
B.C. Provincial Government Plan for Environmental Protection
B.C. Provincial Government Plan for Environmental Protection
BC Utilities Commission: "Kemano Completion Project Review"
BC Utilities Commission: "Kemano Completion Project Review"
"B.C. Water: Missing and Presumed Drained" by Terry Glavin
"B.C. Water: Missing and Presumed Drained" by Terry Glavin
Briefing Document for the Nechako Watershed Council re: Assessment of Options for a Water Release Facility at Kenney Dam prepared by Triton Environmental Consultants
Briefing Document for the Nechako Watershed Council re: Assessment of Options for a Water Release Facility at Kenney Dam prepared by Triton Environmental Consultants
British Columbia Major Projects Inventory, March 1999
British Columbia Major Projects Inventory, March 1999
Carrier Sekani Tribal Council "Lho Dustl'us" Newsletter, vol. 6, issue 1
Carrier Sekani Tribal Council "Lho Dustl'us" Newsletter, vol. 6, issue 1
"Cattle Ranching Activities in Riparian Zones: Nechako Fisheries Conservation Program, Report No. RM90-3.2" prepared by Triton Environmental Consultants, Ltd.
"Cattle Ranching Activities in Riparian Zones: Nechako Fisheries Conservation Program, Report No. RM90-3.2" prepared by Triton Environmental Consultants, Ltd.
"Cheslatta / Murray Lakes and River System: The Role of Hydraulic Flushing on Lake and Stream Primary Productivity and Ecosystem Recovery" prepared by John Stockner (Eco-Logic Ltd) and Pat Slaney (PSlaney Aquatic Science Ltd)
"Cheslatta / Murray Lakes and River System: The Role of Hydraulic Flushing on Lake and Stream Primary Productivity and Ecosystem Recovery" prepared by John Stockner (Eco-Logic Ltd) and Pat Slaney (PSlaney Aquatic Science Ltd)
City of Prince George Flood Risk Evaluation and Flood Control Solutions, Phase I Summary prepared by Northwest Hydraulics Consultants
City of Prince George Flood Risk Evaluation and Flood Control Solutions, Phase I Summary prepared by Northwest Hydraulics Consultants
"Cold Water Release Facility Communication Activities Summary" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
"Cold Water Release Facility Communication Activities Summary" prepared by Denis & Muntener Advertising, Ltd., and Aspen Communications Ltd.
"Cold Water Release Facility Workshops" presentations by Alcan, Triton, Klohn Crippen Integ.
"Cold Water Release Facility Workshops" presentations by Alcan, Triton, Klohn Crippen Integ.
"Compilation of Decisions and Recommendations of the Nechako Environmental Enhancement Fund (NEEF)"
"Compilation of Decisions and Recommendations of the Nechako Environmental Enhancement Fund (NEEF)"
"Conceptual Alternatives for a Release Facility at Kenney Dam: An Interim Report of the KDRF Working Group"
"Conceptual Alternatives for a Release Facility at Kenney Dam: An Interim Report of the KDRF Working Group"
Draft Contract between Nechako Watershed Council and Adam Lewis of Ecofish Research
Draft Contract between Nechako Watershed Council and Adam Lewis of Ecofish Research
"Ecohealth and Watersheds Executive Summary" by International Institute for Sustainable Development
"Ecohealth and Watersheds Executive Summary" by International Institute for Sustainable Development
"Examination of Factors Influencing Nechako River Discharge, Temperature and Aquatic Habitats" Canadian Technical Report of Fisheries and Aquatic Sciences 2773
"Examination of Factors Influencing Nechako River Discharge, Temperature and Aquatic Habitats" Canadian Technical Report of Fisheries and Aquatic Sciences 2773
"Executive Summary re: Cheslatta Lake - River System"
"Executive Summary re: Cheslatta Lake - River System"
"Falls River Water Use Plan" prepared by the BC Hydro Project Team and the Falls River Water Use Plan Consultative Committee
"Falls River Water Use Plan" prepared by the BC Hydro Project Team and the Falls River Water Use Plan Consultative Committee
Federal Government Correspondence, 2000-2001
Federal Government Correspondence, 2000-2001
Fraser Basin Council "2004 State of the Fraser Basin Report: Sustainability Snapshot 2"
Fraser Basin Council "2004 State of the Fraser Basin Report: Sustainability Snapshot 2"
Fraser Basin Council "2006 State of the Fraser Basin Report: Sustainability Snapshot 3"
Fraser Basin Council "2006 State of the Fraser Basin Report: Sustainability Snapshot 3"
Fraser Basin Council Summary of Initiatives
Fraser Basin Council Summary of Initiatives
"Fraser Basin News: The Newsletter of the Fraser Basin Council," vol.7, no.1, summer 2004
"Fraser Basin News: The Newsletter of the Fraser Basin Council," vol.7, no.1, summer 2004
"Habitat Considerations for Nechako White Sturgeon Recovery" prepared by the former Nechako Watershed Council
"Habitat Considerations for Nechako White Sturgeon Recovery" prepared by the former Nechako Watershed Council
History of the Establishment of the Nechako Watershed Council
History of the Establishment of the Nechako Watershed Council
"Kenney Dam Cold Water Release Facility Memorandum on Costs" prepared by Wilson Hydrotechnical Services
"Kenney Dam Cold Water Release Facility Memorandum on Costs" prepared by Wilson Hydrotechnical Services
"Management of Water Temperatures in the Lower Nechako: Water Release Reduction Opportunities with Kenney Dam Temperature Control" Presentation by Fisheries and Oceans Canada
"Management of Water Temperatures in the Lower Nechako: Water Release Reduction Opportunities with Kenney Dam Temperature Control" Presentation by Fisheries and Oceans Canada
Memo to Community Adjustment Fund from Nechako Watershed Council re: Nechako Sturgeon Recovery Facility proposal
Memo to Community Adjustment Fund from Nechako Watershed Council re: Nechako Sturgeon Recovery Facility proposal
Murray - Cheslatta System: Cheslatta Carrier Nation / Southside Economic Development Association Reports, Correspondence and Surveys, 1992-2001
Murray - Cheslatta System: Cheslatta Carrier Nation / Southside Economic Development Association Reports, Correspondence and Surveys, 1992-2001
Nechako Cold Water Release Facility Year 1 Pre-Engineering and Environmental Studies - Nechako Canyon and Cheslatta Fan prepared by Environmental Dynamics Inc.
Nechako Cold Water Release Facility Year 1 Pre-Engineering and Environmental Studies - Nechako Canyon and Cheslatta Fan prepared by Environmental Dynamics Inc.
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results"
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results"
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results" prepared by Dan Bouillon
"Nechako Downstream Allocation Model (N-DAM) DRAFT Simulation Results" prepared by Dan Bouillon
Nechako Downstream Allocation Model: Review and Recommendations prepared by Adam Lewis of Ecofish
Nechako Downstream Allocation Model: Review and Recommendations prepared by Adam Lewis of Ecofish