Looking NW across M.R. excavation from E. end of walkway. First day of work.
Looking NE & N across M.R. excavation from W. end of walkway. Second day of work.
M.R. excavation from E. end of walkway looking NW.
E. side Power Gp. looking SW at concrete block building (Bunker C)
Excavation for 3" dia. W.P. line from NW corner of walkway looking N.
View of excavation for M.R. - North end.
View looking NE Pulp. Gp. excavation.
Brown stock high density tower #2.
Looking West down trench from 8" WFP-47-100.
42" F.R.P. EAS pipe looking S. from about N 60 + 25.
Looking S.E. from North end of Pulping Group excavation.
Chip conveyor center bent looking S.E.
Scenic shots from road to Mill
View looking S.W. of gravel pit.
From top of Digester tower S. side looking down.
WP & WFP & MH #1 along N 50 + 86 - looking E.
Crushing plant - looking S.
24" WMC-36-142 near N59 + 00 looking
30" EAS-36-002 looking W from mixing tank location.
Clmap on 8" WFP-47-100 E-W run next to thrust block at SW corner of campsite.
Chlorination retention tank being lowered into place. Looking SE.
Pit run stockpile - looking W.
14" FRP EA line - looking North from MH #24.
EAS mixing tank - location looking North.
Blowout at or near tie-in for 8" WFP-47-100 at SE corner of camp.
Effluent discharge.
Looking down on break in WFP line near 8" WFP-47-100 tie-in at SE corner of camp looking NE.
View from H.A. Simons field office window.
Looking E. along trench for 24" WMC-36-141. 36" WMC-36-140 & 10" GF-36-120.
30" EM-30-060 & 30" EC-36-060 at track supports for Track 9 looking North.
See drawing attached [rail cars]
See drawing attached [railroad tracks]
24" WMC-36-142 at West end - looking East.
Standing on track #14 looking W parallel to S. wall of power boiler building.
Trench for 8" WFP-36-120 from N66 + 55 looking south.
Power - recaust utility bridge - North end - looking South.
Power - kiln utility bridge - N-S run, North end looking South.
Recaust - kiln utility bridge - E-W run, West end looking East.
8" WFP-36-120 at branch connection to existing 10" WFP.
Power-pulp utility bridge - East end.
Power-pulp utility bridge - East end.
Power to soap utility bridge from North side - looking South East.
Power to soap utility bridge South side - looking Norh
Looking East from NW corner of walkway.
Looking East from SW corner of walkway.
Floor trench - Bleach plant.
6' x 60' strong acid neutralization tank Inlet end.
Spiragester and E.S. lift station from winter road looking SE.
Existing recaust on reactor platform looking N.
"B" mill Pulp Gr. from roof of #1 FWL tank looking NW.