Water Treatment Clarifier from E. Side looking S.W.
"B" Mill Power Group from under Hog Conveyor gallery looking N.W.
Lime Kiln Control Room addition from W. wall of "A" Mill Power Group looking S.
Lime Kiln Control Room addition from S. wall of "A" Mill Power Group looking S.E.
"B" Mill Machine Room from roof of "A" Mill Hi-Density Tank looking N.
"B" Mill Pulping Group from roof of Chemical Unloading Shed looking S.W.
N. wall of "B" mill Machine Room from N.W. corner looking S.E.
Defective weld on Bleach Washer Inlet Vat.
Lagoon from Wier Box looking South East.
Placing rip-rap on dyke near S.W. corner of Lagoon looking N.W.
Defective weld on Bleach Washer Inlet Vat.
Lagoon site from MCC location looking E.
Lagoon inlet pipe from N2+00 and E48+75 looking S.E.
Lagoon from S.E. corner looking W.
Lagoon 36" 0 FRP outlet pipe from discharge end looking E.
Lagoon Wier Box from S. ridge looking N.W.
"42" FRP Lagoon inlet pipe at splitter box end looking N.E.
No. 2 Turbo-Generator foundation looking S.W.
"B" Mill Evaporator building foundation looking N.E.
Lagoon site from N.E. corner looking south.
Recaust G.L.C. Tank looking N.E.
Fiber Salvage Sump "A" Mill Machine Room looking N.E.
"B" Mill Power Group from Track #14 looking N.W.
Fiber Salvage Sump "A" Mill Machine Room looking S.
Trussed girt on W. wall of "B" Mill pulping group looking S.W.
New Lime Kiln piers from Track #14 looking N.W.
"B" Mill Pulping Group at N.W. corner looking N.E.
"B" mill Power Group from roof of Recaust building looking N.E.
Lagoon site, organic overburden from about N24+00 and E49+50 looking S.W.
No. 2 Turbo Generator building from roof of #20 Caustic Tower looking E.
"B" Mill Machine Room from roof of "A" mill Blending Tank looking N.W.
Lagoon site from S.E. corner of existing lagoon looking S.
Lagoon site from S.W. corner of existing lagoon looking S.W.
Lagoon site from top of sand stock pile looking N.W.
"B" Mill machine Room from near Sub-station looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Lagoon site from N23+30 and E41+80 looking S.E.
Steel topped out "B" mill Pulping Group from locker room looking S.E. - 2:00 PM
Lagoon site from N23+30 and E 41+80 looking E.
"B" Mill Power Group from Track #14 looking N.W.
Trailer load of stell for "B" mill Pulping Group W. side looking E.
Lime Rock conveyor from S.E. corner looking N.W.
Vacuum blower in Machine Room looking S.W.
Vacuum blower in Machine Room looking N.E.
Depositing over burden and silt at worked out section of gravel pit looking S.
10EA - 36-007 from N. end of trench looking S.W.
"B" Mill Power Group looking S.W.
Brown Stock spill at N.E. corner "A" Mill Bleach Plant looking W.
Black Liquor Tanks from roof of Warehouse looking S.E.
No. 2 Turbo-Generator building foundations from top of Caustic #20 Tower looking N.E.